SolarEdge P-Series Commercial Power Optimisers

Regular price £75.00 Sale

per 
Tax included. Shipping calculated at checkout.

Availability: Available Unavailable

Product SKU: SEP701-4RM4MRL

  • Exchange or Return within 30 days of a delivery
  • 100% quality Guaranteed Plus Fast & Secure Shipping

  • Stock levels may vary and change frequently. If a product appears to be in stock, it may have already sold out. For any questions regarding availability, please contact us. We appreciate your understanding.
  • Product Details

    ÿCommercial solution for use with three phase inverters connecting two modules per power optimiser, for lower installation costs.

    Features:

    • Per-module Maximum Power Point Tracking (MPPT), with MPPT per two modules using commercial power optimisers
    • Superior efficiency (99.5% peak efficiency, 98.8% weighted efficiency)
    • Mitigates all types of modules mismatch-loss, from manufacturing tolerance to partial shading and aging
    • Designed for extreme environmental conditions
    • 25-year reliability and warranty
    • Advanced, real-time performance measurement
    • Automatic module DC voltage shut-down for installer and firefighter safety
    • Connected by installers to c-Si, thin-film, and high current (including bi-facial) module
    Power Optimizer Model Module Power (1)
    Module Voc Typical Module Compatibility
    P701 ó730W ó96V 2 x 60-cell PV modules
    P730 (2) ó760W ó125V 2 x 72-cell PV modules
    P800p (3) ó800W ó83V Parallel connection of
    2 x 96-cell 5?? PV modules
    P801 (2) ó800W ó125V Series connection of 2 x 72 cell modules
    P850 (2) ó850W ó125V Series connection of 2 x high power or bi-facial modules
    P950 (2) ó950W ó125V Series connection of 2 x high power or bi-facial modules

    (1) Rated combined STC power of two modules connected in series (for the P800p, connected in parallel). Module of up to +5% power tolerance allowed.
    (2) P730 replaced the P700; P850 replaced the P800s. Each pair can be used interchangeably and can be connected in the same string.
    (3) Dual input for parallel connection of two modules; when connecting a single module to the power optimizer (in case of odd number of modules in the string) seal the unused input connectors with the supplied pair of seals.

    Product Reviews

    Loading...

    Your cart